Hella
HELLA PRO 8DD 355 123-481 Brake Disc Internally Vented, Coated, without wheel hub, without wheel studs
HELLA PRO 8DD 355 123-481 Brake Disc Internally Vented, Coated, without wheel hub, without wheel studs
ATTENTION
Before you can continue, you must agree to all of the following terms:
The RM Series is comprised of a damper cartridge secured within a threaded outer body. This specific design requires a lubricating grease to be applied during the assembly process between the two damper and threaded body to avoid metal-to-metal contact. In order to keep the two components from touching each other and generating noise transmission you will need to periodically clean out the old grease and apply new grease.
This is a simple process that can be done with just a few common tools. It does not require you to open the internals of the dampers themselves and therefore you do not need to have the dampers re-pressurized after carrying out this procedure. Please contact us on info@mlperformance.co.uk for more information and a step-by-step guide on how to complete this maintenance.
As a result of this required maintenance, we do not recommend the RM Series for road use over the BR Series or ER Series.
Couldn't load pickup availability
Notify Me When Available
Made by Globo Pre-Order
In Stock
Get It By
Collect 0 points
Purchasing this product will earn you 0 loyalty points worth £0.00 GBP.
Price Match Guarantee
If you find a lower price at an eligible UK retailer website, we will match it.
Fitting service at Xatrix, West Yorkshire
We can offer a fitting service for this part. Contact us for a fitting quote.
This is the HELLA PRO 8DD 355 123-481 Brake Disc Internally Vented, Coated, without wheel hub, without wheel studs.
General Details:
| Diameter (mm) | 280 |
| Thickness (mm) | 22 |
| Disc Type | Internally Vented |
| No. Of Holes |
Please utilize our product recommender to double confirm compatability. Feel free to contact us at info@mlperformance.co.uk should you require any assistance!
To ensure the part(s) you have ordered fits your vehicle, we run a compatibility check prior to dispatch. We can do this either using your registration number(UK) or the last 7 digits of your VIN. Simply enter your car details prior to checkout.
8DD355123-481

Price Match Request
In Stock And Ready To Ship
-
ClearanceVendor:AkrapovicAkrapovic Mercedes-Benz C205 S205 W205 Sound Kit (C63 AMG & C63 S AMG)
Regular price £265.68 Inc. VATRegular priceUnit price / per£425.83Sale price £265.68 Inc. VATOn sale -
ClearanceVendor:Bootmod3Bootmod3 / ProTuning Freaks Key Ring
Regular price £1.11 Inc. VATRegular priceUnit price / per£0.99Sale price £1.11 Inc. VAT -
Vendor:NGKNGK ILZKAR7B11 (1654) - Laser Iridium Spark Plug / Sparkplug - Platinum Ground Electrode
ClearanceVendor:NGKNGK ILZKAR7B11 (1654) - Laser Iridium Spark Plug / Sparkplug - Platinum Ground Electrode
Regular price £13.82 Inc. VATRegular priceUnit price / per£22.70Sale price £13.82 Inc. VATOn sale -
ClearanceVendor:NGKNGK BPR7ES (2023) - Standard Spark Plug / Sparkplug
Regular price £1.76 Inc. VATRegular priceUnit price / per£2.24Sale price £1.76 Inc. VATOn sale -
ClearanceVendor:NGKNGK ZFR5F-11 (2262) - Standard Spark Plug / Sparkplug
Regular price £2.82 Inc. VATRegular priceUnit price / per£3.90Sale price £2.82 Inc. VATOn sale
-
Price Match Guarantee
We are committed to giving you the best price. if you find a lower price on the same item at an eligible UK retailer website, we will match it.
-
Next Day UK Delivery
For in-stock item, get guaranteed next day UK delivery. Same day dispatch available on in-stock items if your order is placed before 1pm UK Time.
-
Worldwide Shipping
We ship worldwide via DHL International, simply enter your full address at checkout to see the shipping option(s) and quote(s). Same day dispatch available if your order is placed before 1pm UK Time on all in stock items!
We appreciate your feedback. Your opinions will help us provide you the best shopping experience.
- Choosing a selection results in a full page refresh.
- Opens in a new window.